Saturday, February 28, 2015

Phase 2



The building of the shed is now complete! Billy even made a beautiful matching door from the scrap wood laying around. We got everything loaded in for the most part. We are having a drizzly Saturday, so we didn't have a lot of time to go through things as much as we wanted to... but we will slowly get it done :)
There is some extra stuff that we will be getting rid of in there now, because of the rain, but everything is accessible! We can walk in and pull down the bin or tool or toy that we need without having to move 10 things out of the way first :) It's beautiful & Billy did an amazing job!
There is a little more clean up to do on the outside, post construction as well as sorting through all the odd materials and hardware we have collected over the years.

Phase 3 will be to paint and trim out the door and corners. Once it's painted, we can hang up the ladders and load up the outer shelving with tile and paint and things that don't need to be sealed up from rodents & weather.
Thanks Bill the Builder for the awesome new storage shed! I'm very grateful :)

2 comments: